Pouring and Finishing a Concrete Slab

Leveling wood form

Step 2: Level Form

Check the form for level, allowing 1/4” slope for every 12’ feet of slab to allow for rain run-off on outdoor slabs.

Patio and sidewalk forms should slope evenly away from structures.

LEAVE A REPLY

Please enter your comment!
Please enter your name here