In addition to my extensive renovation of the existing 1926 house on the Kuppersmith Project, we’re also constructing a new garage and master bedroom suite to complement the home.

Work on the bedroom addition began by laying out the location of the room, then digging trenches for the poured concrete footings that will support the raised foundation. In order to distribute the load and prevent settling, footings are made much wider than the concrete block walls laid on top of them.

Since the garage foundation will have a concrete slab, a different approach is required. Thick footings around the perimeter of the foundation wall were dug to support the weight of the walls, and clay under the slab compacted for the garage floor.

Wooden forms were constructed around the perimeter, then the concrete slab and footings are poured all at the same time. Watch this video to find out more.

Further Information

Related Articles

1 COMMENT

  1. Would like to add a family room (20×15 feet) to my existing 1600 sq ft concrete block construction 1959 Florida home. Would like cbs construction on concrete slab. Have no idea of the cost of such a project and where to begin. Wood construction, although cheaper, is not an option due to sub tropic conditions and hurricanes. Any advice would be greatly appreciated. Thank you for your help.

LEAVE A REPLY

Please enter your comment!
Please enter your name here