Pouring and Finishing a Concrete Slab

Cut control joints

Step 11: Cut Control Joints

Cut in control joints using a groover and straight-edge. A 4” thick slab will require control joints a minimum of every 10’ in each direction.

NOTE: Control joints should be cut a minimum of 1/4 the depth of the slab.

LEAVE A REPLY

Please enter your comment!
Please enter your name here