The Kuppersmith Project 13: Grand Tour
After 200 days of renovation and remodeling, followed by two weeks of decorating from the design team at Better Homes & Gardens and Renovation Style magazines, the Kuppersmith Project house is finally finished, and it’s time to take the grand tour!
The Kuppersmith Project 12: Landscape & Garage
The final touches are underway on the Kuppersmith Project before the decorators arrive. From landscaping and outdoor lighting to finishing the garage and installing door locks, my renovation of this historic 1926 home is almost complete.
The Kuppersmith Project 9: Floor & Patio
Work on the Kuppersmith Project – my extensive renovation of a 1926 Tudor style home – kicked into high gear with the sanding and finishing of the antique heart pine floors and installation of a beautiful paver patio.
The Kuppersmith Project 8: Screens & Driveway
We’re tackling a number of projects outside on the Kuppersmith Project, including installing motorized retractable screens and pouring a colored concrete driveway. Inside we’re putting in a shower surround and putting down a tile floor in the bathroom.
The Kuppersmith Project 3: Exterior
With the demolition and foundation work out of the way on the Kuppersmith Project, we’re finally ready to start building the addition and renovating the existing exterior to turn our 1926 house into a practical home any family would love to own.